ఇంటి స్థలంResidential plot
₹8,000
per sq yd
పాత రేటుPrevious rate
—
per sq yd
భవనంBuilding, ground floor
—
per sq ft
వ్యవసాయ భూమిFarm land
₹70.00 L
per acre
అక్కిరెడ్డిపాలెంలో ఇంటి స్థలం ప్రభుత్వ విలువ గజానికి ₹8,000, వ్యవసాయ భూమి ఎకరాకు ₹70.00 L. 100 గజాల స్థలానికి ప్రభుత్వ విలువ సుమారు ₹8.00 L.
In Ankireddipalem, the government value of a house plot is ₹8,000 per sq yard and farm land is ₹70.00 L per acre. These are minimum values for registration, not sale prices.
Benchmark
Ankireddipalem vs its mandal & district
Ankireddipalem vs its mandal & district
Residential plot rate per sq yd; mandal and district figures are medians.
Location
Ankireddipalem & nearest villages
Ankireddipalem & nearest villages
Price history
ధరల మార్పు
వ్యవసాయ భూమిFarm land · per acre
+7.7%Government market value before and after the latest revision, as published by the Andhra Pradesh Registration Department. Farm land uses the typical (median) rate across land classes.
PDF REPORT
అక్కిరెడ్డిపాలెం పూర్తి భూమి ధర నివేదిక
Every official rate, all 1655 survey numbers, price history, registration cost table and nearby villages in one print-ready PDF.
Registration cost calculator
రిజిస్ట్రేషన్ ఖర్చు కాలిక్యులేటర్
మొత్తం చెల్లించాల్సింది · Total payable
—
on a duty value of —
| Government value | — |
| Stamp duty | — |
| Transfer duty | — |
| Registration fee | — |
Sale deed, AP: stamp duty 5%, transfer duty 1.5%, registration fee 1%. Estimate only — user charges and concessions not included. Confirm at the Sub-Registrar's Office.
Agricultural land by class · per acre
వ్యవసాయ భూమి రేట్లు
| Land class | Rate per acre | Previous | Effective |
|---|---|---|---|
| Agricultural Land fit for H.S. | ₹1,02,85,000 | ₹96,80,000 | 01-02-2025 |
| Agricultural Land fit for H.S. | ₹1,02,85,000 | ₹96,80,000 | 01-02-2025 |
| Agricultural Land fit for H.S. | ₹1,02,85,000 | ₹96,80,000 | 01-02-2025 |
| Agricultural Land fit for H.S. | ₹1,02,85,000 | ₹96,80,000 | 01-02-2025 |
| Agricultural Land fit for H.S. | ₹1,02,85,000 | ₹96,80,000 | 01-02-2025 |
| Dry land | ₹70,00,000 | ₹65,00,000 | 01-02-2025 |
| Dry land | ₹70,00,000 | ₹65,00,000 | 01-02-2025 |
| Dry land | ₹70,00,000 | ₹65,00,000 | 01-02-2025 |
| Dry land | ₹70,00,000 | ₹65,00,000 | 01-02-2025 |
| Dry land | ₹70,00,000 | ₹65,00,000 | 01-02-2025 |
| House Sites | ₹3,87,20,000 | ₹3,87,20,000 | 01-02-2025 |
| House Sites | ₹3,87,20,000 | ₹3,87,20,000 | 01-02-2025 |
| House Sites | ₹3,87,20,000 | ₹3,87,20,000 | 01-02-2025 |
| House Sites | ₹3,87,20,000 | ₹3,87,20,000 | 01-02-2025 |
| House Sites | ₹3,87,20,000 | ₹3,87,20,000 | 01-02-2025 |
| Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | ₹1,27,35,000 | 01-02-2025 |
| Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | ₹1,27,35,000 | 01-02-2025 |
| Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | ₹1,27,35,000 | 01-02-2025 |
| Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | ₹1,27,35,000 | 01-02-2025 |
| Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | ₹1,27,35,000 | 01-02-2025 |
Survey number-wise rates (1655) · సర్వే నంబర్ వారీ
| Survey no. | Sub-division | Land class | Rate per acre | Effective |
|---|---|---|---|---|
| 3 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 3 | B | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 3 | C | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 3 | D | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 3 | E | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 3 | F | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 3 | G | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 4 | 1 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 4 | 2 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 4 | 2A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 4 | B | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 5 | 1 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 5 | 2 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 6 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 7 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 7 | B | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 7 | C | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 7 | D | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 8 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 8 | B | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 8 | C | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 8 | D | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 9 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 10 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 11 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 11 | C | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 11 | D | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 12 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 13 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 13 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 14 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 14 | B | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 14 | D | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 14 | E | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 15 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 15 | C | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 15 | D | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 16 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 16 | B | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 16 | D | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 16 | E | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 17 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 17 | B | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 17 | C | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 17 | D | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 17 | E | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 18 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 18 | C | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 19 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 19 | C | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 20 | B | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 20 | C | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 21 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 21 | B | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 21 | C | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 22 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 22 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 23 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 23 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 24 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 25 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 27 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 27 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 27 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 28 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 28 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 29 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 30 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 30 | B | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 30 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 30 | D | Dry land | ₹70,00,000 | 01-02-2025 |
| 32 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 32 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 32 | 3 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 33 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 33 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 33 | 4 | Dry land | ₹70,00,000 | 01-02-2025 |
| 33 | 5 | Dry land | ₹70,00,000 | 01-02-2025 |
| 33 | 6 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 33 | 7 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 33 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 33 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 35 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 35 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 35 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 35 | D | Dry land | ₹70,00,000 | 01-02-2025 |
| 35 | F | Dry land | ₹70,00,000 | 01-02-2025 |
| 35 | G | Dry land | ₹70,00,000 | 01-02-2025 |
| 35 | H | Dry land | ₹70,00,000 | 01-02-2025 |
| 36 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 36 | C | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 37 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 37 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 37 | A1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 37 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 37 | B1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 37 | B2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 38 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 39 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 39 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 40 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 40 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 40 | C | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 41 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 42 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 43 | A1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 43 | A3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 43 | B | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 43 | C | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 43 | D | Dry land | ₹70,00,000 | 01-02-2025 |
| 44 | A1 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 44 | A3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 44 | B | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 44 | C | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 44 | D1 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 44 | D2 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 44 | E | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 44 | F | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 44 | G | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 45 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 46 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 47 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 47 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 47 | C | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 47 | D | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 50 | A1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 50 | A2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 50 | A3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 50 | B1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 51 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 52 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 53 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 54 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 55 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 56 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 56 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 56 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 56 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 57 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 57 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 57 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 57 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 57 | E | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 58 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 58 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 58 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 58 | D | Dry land | ₹70,00,000 | 01-02-2025 |
| 61 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 62 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 63 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 65 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 66 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 68 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 70 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 71 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 72 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 73 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 74 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 75 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 76 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 78 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 79 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 80 | 1A | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 80 | 2 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 80 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 82 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 82 | B | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 83 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 83 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 84 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 84 | B | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 85 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 86 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 88 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 88 | B | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 88 | C | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 88 | D | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 89 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 90 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 93 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 94 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 94 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 94 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 95 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 96 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 96 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 96 | B1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 97 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 99 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 101 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 102 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 102 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 103 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 104 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 104 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 104 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 105 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 106 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 107 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 111 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 113 | 1 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 113 | 2 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 114 | 1 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 114 | 2 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 114 | 3 | Land abutting NH/SH/ZPP/MPP | ₹6,29,20,000 | 01-02-2025 |
| 115 | 1 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 115 | 2 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 117 | House Sites | ₹7,26,00,000 | 01-02-2025 | |
| 118 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 119 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 121 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 123 | House Sites | ₹7,26,00,000 | 01-02-2025 | |
| 124 | House Sites | ₹7,26,00,000 | 01-02-2025 | |
| 125 | A | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 125 | B | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 126 | House Sites | ₹7,26,00,000 | 01-02-2025 | |
| 128 | House Sites | ₹7,26,00,000 | 01-02-2025 | |
| 129 | House Sites | ₹7,26,00,000 | 01-02-2025 | |
| 130 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 133 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 134 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 134 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 134 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 136 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 136 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 137 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 137 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 138 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 138 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 138 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 139 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 139 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 140 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 140 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 140 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 140 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 141 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 141 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 141 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 141 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 142 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 142 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 142 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 142 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 143 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 144 | A | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 144 | B | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 145 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 148 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 149 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 149 | B1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 149 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 150 | A | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 150 | C1 | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 150 | C2 | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 152 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 153 | House Sites | ₹7,26,00,000 | 01-02-2025 | |
| 155 | House Sites | ₹7,26,00,000 | 01-02-2025 | |
| 156 | A | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 156 | B | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 156 | C | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 156 | D | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 156 | E | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 159 | A | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 159 | B | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 160 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 160 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 161 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 162 | A | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 162 | B1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 162 | C | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 163 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 163 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 164 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 164 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 164 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 165 | A | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 165 | B | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 167 | A | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 167 | B | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 168 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 168 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 169 | A | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 169 | C | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 170 | House Sites | ₹7,26,00,000 | 01-02-2025 | |
| 172 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 174 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 175 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 177 | A | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 177 | B | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 178 | A | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 178 | C1A | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 178 | C1B | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 178 | C2 | House Sites | ₹7,26,00,000 | 01-02-2025 |
| 180 | House Sites | ₹7,26,00,000 | 01-02-2025 | |
| 181 | 1AB | House Sites | ₹9,19,60,000 | 01-02-2025 |
| 181 | A | House Sites | ₹9,19,60,000 | 01-02-2025 |
| 181 | A1A | House Sites | ₹9,19,60,000 | 01-02-2025 |
| 181 | C | House Sites | ₹9,19,60,000 | 01-02-2025 |
| 182 | A | House Sites | ₹9,19,60,000 | 01-02-2025 |
| 182 | B | House Sites | ₹9,19,60,000 | 01-02-2025 |
| 183 | B1 | House Sites | ₹9,19,60,000 | 01-02-2025 |
| 185 | A | House Sites | ₹9,19,60,000 | 01-02-2025 |
| 185 | C | House Sites | ₹9,19,60,000 | 01-02-2025 |
| 185 | D | House Sites | ₹9,19,60,000 | 01-02-2025 |
| 187 | AB | House Sites | ₹9,19,60,000 | 01-02-2025 |
| 188 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 189 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 189 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 190 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 192 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 192 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 192 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 193 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 193 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 194 | House Sites | ₹6,77,60,000 | 01-02-2025 | |
| 195 | A | House Sites | ₹6,77,60,000 | 01-02-2025 |
| 195 | B | House Sites | ₹6,77,60,000 | 01-02-2025 |
| 197 | A | House Sites | ₹6,77,60,000 | 01-02-2025 |
| 197 | B | House Sites | ₹6,77,60,000 | 01-02-2025 |
| 197 | C | House Sites | ₹6,77,60,000 | 01-02-2025 |
| 199 | A | House Sites | ₹6,77,60,000 | 01-02-2025 |
| 199 | B | House Sites | ₹6,77,60,000 | 01-02-2025 |
| 199 | C | House Sites | ₹6,77,60,000 | 01-02-2025 |
| 200 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 200 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 201 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 201 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 201 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 202 | A | House Sites | ₹6,77,60,000 | 01-02-2025 |
| 202 | B | House Sites | ₹6,77,60,000 | 01-02-2025 |
| 204 | House Sites | ₹6,77,60,000 | 01-02-2025 | |
| 205 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 205 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 205 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 206 | House Sites | ₹6,77,60,000 | 01-02-2025 | |
| 207 | House Sites | ₹6,77,60,000 | 01-02-2025 | |
| 208 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 208 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 208 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 210 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 212 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 212 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 213 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 213 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 213 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 214 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 214 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 214 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 214 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 214 | E | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 215 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 215 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 218 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 218 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 218 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 218 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 219 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 219 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 219 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 220 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 221 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 221 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 223 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 224 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 224 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 225 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 226 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 227 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 228 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 228 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 228 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 228 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 228 | E | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 228 | F | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 228 | G | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 229 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 230 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 230 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 232 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 233 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 234 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 234 | A1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 235 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 237 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 237 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 238 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 238 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 241 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 241 | C2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 242 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 242 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 243 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 243 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 246 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 248 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 248 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 249 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 249 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 251 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 251 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 251 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 252 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 252 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 252 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 253 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 253 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 253 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 254 | A1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 254 | A2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 254 | A3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 255 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 256 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 257 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 257 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 258 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 258 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 259 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 259 | A1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 259 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 260 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 260 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 262 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 262 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 263 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 263 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 264 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 265 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 267 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 267 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 268 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 268 | A1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 268 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 269 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 269 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 269 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 269 | 8 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 270 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 270 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 270 | 3 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 271 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 271 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 278 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 278 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 278 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 279 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 279 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 279 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 280 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 280 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 280 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 281 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 281 | A1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 281 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 282 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 283 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 283 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 284 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 284 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 284 | C | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 285 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 285 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 285 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 286 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 287 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 287 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 287 | 3 | Dry land | ₹1,30,00,000 | 01-02-2025 |
| 289 | A | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 289 | B | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 291 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 292 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 292 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 293 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 293 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 293 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 294 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 295 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 296 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 296 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 297 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 298 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 299 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 300 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 300 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 301 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 302 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 303 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 304 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 305 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 307 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 308 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 309 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 310 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 311 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 312 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 313 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 317 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 318 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 318 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 318 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 318 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 320 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 321 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 321 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 321 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 322 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 322 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 323 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 324 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 324 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 326 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 328 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 328 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 328 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 329 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 329 | A1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 329 | A2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 329 | B1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 329 | B2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 329 | B3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 331 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 332 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 332 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 332 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 332 | C1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 333 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 334 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 336 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 338 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 340 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 341 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 342 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 344 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 344 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 345 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 345 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 345 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 345 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 347 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 348 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 349 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 350 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 351 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 352 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 353 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 354 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 354 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 356 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 357 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 359 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 359 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 359 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 360 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 360 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 360 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 360 | D | Dry land | ₹70,00,000 | 01-02-2025 |
| 361 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 361 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 361 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 362 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 363 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 364 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 365 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 365 | B | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 365 | C | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 365 | D | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 365 | E | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 365 | F | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 365 | G | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 366 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 366 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 367 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 368 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 369 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 371 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 371 | A | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 372 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 372 | B | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 373 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 373 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 373 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 374 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 374 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 375 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 375 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 376 | 1A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 376 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 376 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 377 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 377 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 377 | 4 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 377 | A1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 377 | A2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 377 | B1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 377 | B2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 377 | B3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 377 | C1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 377 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 379 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 379 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 379 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 379 | 4 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 379 | 5 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 381 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 381 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 381 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 381 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 382 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 384 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 385 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 387 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 387 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 387 | A1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 387 | A2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 387 | B1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 387 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 387 | C1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 388 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 388 | A1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 388 | A2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 388 | B1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 389 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 389 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 390 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 391 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 392 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 393 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 394 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 396 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 396 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 397 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 398 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 399 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 399 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 400 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 400 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 401 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 402 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 402 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 402 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 404 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 405 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 405 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 407 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 409 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 410 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 411 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 412 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 414 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 414 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 415 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 415 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 416 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 416 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 416 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 417 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 417 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 418 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 418 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 419 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 420 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 421 | 1A | Dry land | ₹70,00,000 | 01-02-2025 |
| 421 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 421 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 421 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 421 | D | Dry land | ₹70,00,000 | 01-02-2025 |
| 422 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 423 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 424 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 425 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 426 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 426 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 426 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 427 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 428 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 429 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 434 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 434 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 434 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 434 | D | Dry land | ₹70,00,000 | 01-02-2025 |
| 435 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 435 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 435 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 436 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 436 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 437 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 437 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 438 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 439 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 439 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 440 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 440 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 440 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 440 | D | Dry land | ₹70,00,000 | 01-02-2025 |
| 441 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 441 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 441 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 441 | D | Dry land | ₹70,00,000 | 01-02-2025 |
| 441 | E | Dry land | ₹70,00,000 | 01-02-2025 |
| 441 | F | Dry land | ₹70,00,000 | 01-02-2025 |
| 441 | G | Dry land | ₹70,00,000 | 01-02-2025 |
| 442 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 444 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 445 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 447 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 447 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 448 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 450 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 450 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 451 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 451 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 454 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 455 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 457 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 458 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 459 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 460 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 461 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 462 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 464 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 465 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 466 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 467 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 468 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 469 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 469 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 470 | 1A | Dry land | ₹70,00,000 | 01-02-2025 |
| 470 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 470 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 471 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 472 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 472 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 473 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 474 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 475 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 476 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 477 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 479 | 1A | Dry land | ₹70,00,000 | 01-02-2025 |
| 479 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 480 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 481 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 481 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 482 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 483 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 484 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 485 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 486 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 487 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 488 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 488 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 488 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 489 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 490 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 491 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 492 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 493 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 494 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 495 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 496 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 497 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 497 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 499 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 500 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 501 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 501 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 502 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 502 | 2A | Dry land | ₹70,00,000 | 01-02-2025 |
| 502 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 503 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 504 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 504 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 505 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 506 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 507 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 507 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 507 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 508 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 508 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 508 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 509 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 509 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 509 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 509 | C1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 509 | D | Dry land | ₹70,00,000 | 01-02-2025 |
| 510 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 510 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 512 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 512 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 513 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 514 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 514 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 515 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 516 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 517 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 518 | 1A | Dry land | ₹70,00,000 | 01-02-2025 |
| 518 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 518 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 519 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 519 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 520 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 520 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 521 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 521 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 521 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 521 | D | Dry land | ₹70,00,000 | 01-02-2025 |
| 521 | E | Dry land | ₹70,00,000 | 01-02-2025 |
| 522 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 522 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 523 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 524 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 525 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 526 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 529 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 531 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 532 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 533 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 534 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 538 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 538 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 538 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 538 | 4 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 539 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 541 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 542 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 543 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 543 | A1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 543 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 544 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 545 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 546 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 547 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 548 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 549 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 550 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 551 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 552 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 553 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 554 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 555 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 555 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 555 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 556 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 556 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 556 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 557 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 557 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 557 | 3 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 558 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 558 | 3 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 559 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 560 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 561 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 562 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 562 | C | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 563 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 563 | 3 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 563 | 4 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 563 | A1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 563 | A3 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 563 | C | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 564 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 568 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 570 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 571 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 573 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 574 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 575 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 575 | C | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 576 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 576 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 576 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 577 | 3A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 577 | 3B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 577 | A1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 577 | C2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 578 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 578 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 578 | 3 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 579 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 581 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 581 | A2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 581 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 582 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 583 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 584 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 585 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 586 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 587 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 588 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 589 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 591 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 591 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 592 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 593 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 594 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 596 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 597 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 598 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 598 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 600 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 601 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 602 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 602 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 603 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 605 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 605 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 606 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 607 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 607 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 608 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 608 | C1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 608 | C2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 609 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 609 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 610 | A2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 610 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 612 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 613 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 614 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 615 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 616 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 619 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 620 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 621 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 624 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 625 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 628 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 629 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 630 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 631 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 632 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 633 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 634 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 635 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 636 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 637 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 640 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 640 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 641 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 642 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 643 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 644 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 644 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 644 | C | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 644 | D | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 645 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 645 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 645 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 646 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 646 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 647 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 647 | A1A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 647 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 647 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 647 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 648 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 648 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 648 | C1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 649 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 650 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 651 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 652 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 652 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 653 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 653 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 653 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 654 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 655 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 656 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 657 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 658 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 658 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 659 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 659 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 660 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 660 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 661 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 664 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 664 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 665 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 665 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 667 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 668 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 669 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 670 | A1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 670 | A2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 670 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 670 | C | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 670 | D | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 673 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 674 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 676 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 678 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 679 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 680 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 681 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 682 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 683 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 684 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 684 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 685 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 686 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 686 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 687 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 688 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 688 | 1A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 688 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 689 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 691 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 693 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 693 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 693 | 3 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 694 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 695 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 696 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 697 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 698 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 698 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 699 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 699 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 700 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 700 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 701 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 701 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 702 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 703 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 705 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 706 | A | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 706 | B | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 707 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 708 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 709 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 710 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 711 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 712 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 714 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 715 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 716 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 717 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 717 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 717 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 718 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 718 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 719 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 720 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 721 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 722 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 723 | Dry land | ₹3,87,20,000 | 01-02-2025 | |
| 724 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 724 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 725 | 4 | Dry land | ₹70,00,000 | 01-02-2025 |
| 727 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 728 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 728 | AB2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 728 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 729 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 730 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 730 | C | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 731 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 733 | 1B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 733 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 734 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 735 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 736 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 737 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 738 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 739 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 740 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 741 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 741 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 742 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 743 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 744 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 745 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 747 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 748 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 749 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 749 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 749 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 749 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 750 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 751 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 753 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 754 | B1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 754 | B2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 756 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 757 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 758 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 759 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 760 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 760 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 761 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 762 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 763 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 763 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 764 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 765 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 766 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 766 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 767 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 768 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 770 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 771 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 772 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 772 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 773 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 774 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 775 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 776 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 777 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 778 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 779 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 780 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 781 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 782 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 783 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 784 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 785 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 786 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 786 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 787 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 788 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 790 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 791 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 792 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 792 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 792 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 792 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 792 | E | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 792 | F | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 793 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 794 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 794 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 795 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 796 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 797 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 798 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 799 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 800 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 801 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 802 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 802 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 803 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 804 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 804 | E | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 805 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 806 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 807 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 807 | C | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 808 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 809 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 809 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 810 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 811 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 814 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 815 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 815 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 816 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 816 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 816 | C | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 816 | D | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 816 | E | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 816 | F | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 816 | G | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 817 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 817 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 817 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 818 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 818 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 818 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 820 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 820 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 822 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 822 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 823 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 824 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 825 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 826 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 827 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 827 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 827 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 829 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 829 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 829 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 830 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 830 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 831 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 833 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 834 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 836 | 1 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 836 | 2 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 836 | 3 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 837 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 838 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 840 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 841 | 1 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 841 | 2 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 841 | 3 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 842 | 1 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 842 | 2 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 843 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 844 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 845 | 1 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 845 | 2 | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 846 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 847 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 847 | B | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 848 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 849 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 850 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 852 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 853 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 854 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 855 | A | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 855 | B | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 855 | C | House Sites | ₹6,29,20,000 | 01-02-2025 |
| 856 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 861 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 861 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 863 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 864 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 865 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 867 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 868 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 869 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 870 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 871 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 873 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 873 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 873 | 3A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 873 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 874 | House Sites | ₹6,29,20,000 | 01-02-2025 | |
| 875 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 876 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 876 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 876 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 878 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 879 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 880 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 881 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 882 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 883 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 884 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 886 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 887 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 888 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 889 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 890 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 891 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 891 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 891 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 891 | B1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 891 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 892 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 892 | 2A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 892 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 892 | C | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 894 | 4 | Dry land | ₹70,00,000 | 01-02-2025 |
| 894 | 5 | Dry land | ₹70,00,000 | 01-02-2025 |
| 896 | A | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 896 | B | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 896 | C | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 897 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 897 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 897 | D | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 898 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 898 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 898 | C | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 898 | E | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 898 | F1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 898 | F2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 898 | G | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 898 | H | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 899 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 899 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 900 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 901 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 901 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 901 | A1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 901 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 902 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 904 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 905 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 906 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 907 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 909 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 910 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 911 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 915 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 916 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 917 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 918 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 919 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 920 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 920 | 1A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 920 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 920 | 2A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 920 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 921 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 921 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 922 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 924 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 925 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 926 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 926 | 2 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 927 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 928 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 929 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 930 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 930 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 931 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 932 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 933 | 1B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 933 | 4B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 933 | A4 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 933 | B4B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 934 | A1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 934 | A2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 934 | B1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 934 | B2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 935 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 938 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 941 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 943 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 944 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 945 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 946 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 948 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 949 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 950 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 950 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 951 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 952 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 953 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 954 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 955 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 957 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 959 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 960 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 961 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 963 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 964 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 965 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 967 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 968 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 968 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 968 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 969 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 971 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 971 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 971 | 3 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 972 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 975 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 976 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 977 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 978 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 980 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 980 | 2A | Dry land | ₹70,00,000 | 01-02-2025 |
| 980 | 2C | Dry land | ₹70,00,000 | 01-02-2025 |
| 980 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 980 | 4 | Dry land | ₹70,00,000 | 01-02-2025 |
| 980 | A1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 980 | A2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 980 | B1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 980 | B2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 981 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 982 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 984 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 984 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 984 | C1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 988 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 990 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 991 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 992 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 992 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 992 | A | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 992 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 992 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 992 | D | Dry land | ₹70,00,000 | 01-02-2025 |
| 993 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 994 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 994 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 995 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 996 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 997 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 997 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 998 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 998 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 999 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 999 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 1000 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1001 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1002 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1003 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1004 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1005 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 1005 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 1005 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 1005 | D | Dry land | ₹70,00,000 | 01-02-2025 |
| 1005 | E | Dry land | ₹70,00,000 | 01-02-2025 |
| 1005 | F | Dry land | ₹70,00,000 | 01-02-2025 |
| 1009 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1011 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1012 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 1012 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 1012 | B1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1014 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1015 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1016 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1018 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1019 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1021 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1022 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1023 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1024 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1025 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 1025 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 1026 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1027 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1028 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1029 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1030 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1031 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1032 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1033 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1034 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1035 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1038 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1039 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1040 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1041 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1042 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1043 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 1043 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 1044 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1045 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1046 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1046 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1047 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1048 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1049 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1050 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1051 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1052 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1053 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 1054 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1056 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 1056 | B1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 1056 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1057 | Land abutting NH/SH/ZPP/MPP | ₹3,87,20,000 | 01-02-2025 | |
| 1058 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1059 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1060 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1060 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1060 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1061 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1061 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1061 | B1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1061 | C1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1062 | A | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 1062 | B | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 1063 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1064 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1065 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1066 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1067 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1069 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1070 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1071 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1072 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1073 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 1074 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1075 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1075 | Agricultural Land fit for H.S. | ₹3,87,20,000 | 01-02-2025 | |
| 1076 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 | |
| 1077 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1078 | 1 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 1078 | 2 | Land abutting NH/SH/ZPP/MPP | ₹1,30,00,000 | 01-02-2025 |
| 1079 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1080 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1081 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1084 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1085 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1086 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1087 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 1088 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 1089 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 1090 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 1091 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1093 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1094 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1096 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1097 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1099 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1102 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1103 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 1104 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 1105 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1106 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1109 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1110 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 1111 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 1112 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 1113 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1114 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1118 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1120 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 1122 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 1123 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 | |
| 1130 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1131 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1132 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1133 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1134 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1135 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1136 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1137 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1138 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1139 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1142 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1142 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1143 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1144 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1145 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1146 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1147 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1148 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1149 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1150 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1152 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1153 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1156 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1159 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1160 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1161 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1161 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1161 | 4A | Dry land | ₹70,00,000 | 01-02-2025 |
| 1163 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1164 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1165 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1166 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1167 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1168 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1169 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1173 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1174 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1175 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1176 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1177 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1178 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1181 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1182 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1184 | A1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1184 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1185 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1185 | A1D | Dry land | ₹70,00,000 | 01-02-2025 |
| 1186 | 1B | Dry land | ₹70,00,000 | 01-02-2025 |
| 1186 | 2B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1188 | 1 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 1188 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1188 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1189 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1190 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1190 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1191 | 1A | Dry land | ₹70,00,000 | 01-02-2025 |
| 1191 | 2A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1191 | 2B | Dry land | ₹70,00,000 | 01-02-2025 |
| 1191 | C | Dry land | ₹70,00,000 | 01-02-2025 |
| 1192 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1193 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1193 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1193 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1194 | 2A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1194 | 2B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1194 | A1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1195 | AB | Dry land | ₹70,00,000 | 01-02-2025 |
| 1199 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1200 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1202 | A | Dry land | ₹70,00,000 | 01-02-2025 |
| 1202 | B1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1203 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1206 | 2 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 1206 | A | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 1206 | B1 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 1207 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1207 | A1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1207 | A2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1207 | B | Dry land | ₹70,00,000 | 01-02-2025 |
| 1209 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1210 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1211 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1215 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1216 | D | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1217 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1218 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1220 | 2B | Dry land | ₹70,00,000 | 01-02-2025 |
| 1220 | A1B | Dry land | ₹70,00,000 | 01-02-2025 |
| 1221 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1223 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1224 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1225 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1227 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1228 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1230 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1231 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1232 | 1 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 1232 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1232 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1233 | 1 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 1233 | 2 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 1233 | 3 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 1234 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1234 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1234 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1235 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1235 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1235 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1236 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1236 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1236 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1237 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1237 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1237 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1238 | 1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1238 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1238 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1239 | 1A | Dry land | ₹70,00,000 | 01-02-2025 |
| 1239 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1240 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1240 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1241 | A | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 1241 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1241 | B2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1241 | C2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1242 | 2B | Dry land | ₹70,00,000 | 01-02-2025 |
| 1242 | 3B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1242 | A1 | Agricultural Land fit for H.S. | ₹1,02,85,000 | 01-02-2025 |
| 1242 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1242 | D | Dry land | ₹70,00,000 | 01-02-2025 |
| 1243 | 1B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1243 | 2 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1244 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1245 | Dry land | ₹70,00,000 | 01-02-2025 | |
| 1246 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1246 | 3 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1246 | A1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1246 | B1 | Dry land | ₹70,00,000 | 01-02-2025 |
| 1247 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1247 | C | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1248 | House Sites | ₹3,87,20,000 | 01-02-2025 | |
| 1249 | 2 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1250 | 1 | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1251 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1251 | B | House Sites | ₹3,87,20,000 | 01-02-2025 |
| 1252 | A | House Sites | ₹3,87,20,000 | 01-02-2025 |
Compare with nearby villages
పక్క గ్రామాలు
| Village | Distance | Plot ₹/sq yd | vs Ankireddipalem | Growth / yr |
|---|---|---|---|---|
| Ankireddipalem (gmc)అక్కిరెడ్డిపాలెం Guntur West | 0.0 km | ₹12,000 | +50% | 0.0% |
| Ankireddipalem (v)అక్కిరెడ్డిపాలెం Guntur West | 0.0 km | ₹8,000 | +0% | 0.0% |
| Koritepadu (r) Guntur West | 1.1 km | ₹35,000 | +338% | 5.5% |
| Koritepadu (gorantla) Guntur West | 1.1 km | ₹20,000 | +150% | 10.2% |
| R.agraharam (u) Guntur West | 1.1 km | ₹13,000 | +62% | 10.5% |
| Nallapaduనల్లపాడు Guntur West | 1.3 km | ₹8,000 | +0% | — |
| Nallapadu (gmc)నల్లపాడు Guntur West | 1.3 km | ₹27,000 | +238% | 2.3% |
| Nallapadu(v)నల్లపాడు Guntur West | 1.3 km | ₹13,000 | +62% | 4.9% |
| Pothuruపొత్తూరు Guntur West | 3.9 km | ₹4,650 | -42% | — |
| Pothuruపొత్తూరు Guntur West | 3.9 km | ₹4,650 | -42% | 0.0% |
FAQ
తరచుగా అడిగే ప్రశ్నలు
- What is the government land rate in Ankireddipalem?
- The residential plot rate is ₹8,000 per square yard. Farm land: ₹70.00 L per acre.
- Is this the actual selling price?
- No. It is the minimum value fixed by the government for registration. Real sale prices are usually higher, and stamp duty is charged on whichever is higher.
- How do I verify it?
- Check the official Registration & Stamps Department, Govt of Andhra Pradesh (IGRS AP) website, or ask the Sub-Registrar's Office.
Source: Registration & Stamps Department, Govt of Andhra Pradesh (IGRS AP) (public market value pages). LandRate.in is not an official government website.