వెల్లలూరులో ఇంటి స్థలం ప్రభుత్వ విలువ గజానికి ₹1,800, వ్యవసాయ భూమి ఎకరాకు ₹12.00 L.
In Vellalur, the government value of a house plot is ₹1,800 per sq yard and farm land is ₹12.00 L per acre. These are minimum values for registration, not sale prices.
| Property | Govt value | Stamp duty 5.0% | Transfer 1.5% | Reg. fee 1.0% | Total 7.5% |
|---|---|---|---|---|---|
| 100 గజాల స్థలం · 100 sq yd plot | ₹1,80,000 | ₹9,000 | ₹2,700 | ₹1,800 | ₹13,500 |
| 200 గజాల స్థలం · 200 sq yd plot | ₹3,60,000 | ₹18,000 | ₹5,400 | ₹3,600 | ₹27,000 |
| 300 గజాల స్థలం · 300 sq yd plot | ₹5,40,000 | ₹27,000 | ₹8,100 | ₹5,400 | ₹40,500 |
| 1 ఎకరం వ్యవసాయ భూమి · 1 acre farm land | ₹12,00,000 | ₹60,000 | ₹18,000 | ₹12,000 | ₹90,000 |
| Locality / ward | Type | Land ₹/sq yd | Previous | Ground ₹/sq ft | First | Other | Effective |
|---|---|---|---|---|---|---|---|
| ALL HOUSE SITES | Residential | ₹1,800 | ₹1,600 | ₹1,400 | ₹1,400 | ₹1,400 | 01-02-2025 |
| NEW LAY OUT | Residential | ₹1,800 | ₹1,600 | ₹1,400 | ₹1,400 | ₹1,400 | 01-02-2025 |
| Land class | Rate per acre | Previous | Effective |
|---|---|---|---|
| Agricultural Land fit for H.S. | ₹27,50,000 | ₹27,50,000 | 01-02-2025 |
| Coconut Garden | ₹12,00,000 | — | 01-02-2025 |
| Dry land | ₹12,00,000 | ₹10,40,000 | 01-02-2025 |
| House Sites | ₹87,12,000 | ₹77,44,000 | 01-02-2025 |
| Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | ₹19,65,000 | 01-02-2025 |
| Wet Land double crop | ₹12,00,000 | ₹10,40,000 | 01-02-2025 |
| Survey no. | Sub-division | Land class | Rate per acre | Effective |
|---|---|---|---|---|
| 4 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 4 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 5 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 5 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 6 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 6 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 6 | 3 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 6 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 7 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 7 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 7 | 3 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 7 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 9 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 9 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 9 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 9 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 9 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 13 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 13 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 13 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 13 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 13 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 14 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 14 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 14 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 14 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 14 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 17 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 17 | 2A | Dry land | ₹13,00,000 | 01-02-2025 |
| 17 | 2B | Dry land | ₹13,00,000 | 01-02-2025 |
| 20 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 20 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 20 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 20 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 21 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 21 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 22 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 22 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 22 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 22 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 22 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 23 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 23 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 23 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 23 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 23 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 23 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 29 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 29 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 30 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 | |
| 31 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 | |
| 35 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 35 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 35 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 38 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 38 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 39 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 39 | 2A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 39 | 2B | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 39 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 39 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 39 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 39 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 40 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 40 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 40 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 40 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 40 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 41 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 41 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 41 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 41 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 41 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 41 | 7 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 41 | 8 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 41 | 9 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 41 | 10 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 42 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 42 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 42 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 42 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 42 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 42 | 6 | Dry land | ₹13,00,000 | 01-02-2025 |
| 42 | 7 | Dry land | ₹13,00,000 | 01-02-2025 |
| 42 | 8 | Dry land | ₹13,00,000 | 01-02-2025 |
| 42 | 9 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 43 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 44 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 | |
| 47 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 47 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 47 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 47 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 47 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 47 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 47 | 7 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 47 | 8 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 47 | 9 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 47 | 10 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 48 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 48 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 48 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 48 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 48 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 49 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 49 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 49 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 49 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 49 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 49 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 50 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 | |
| 51 | Dry land | ₹13,00,000 | 01-02-2025 | |
| 53 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 53 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 53 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 53 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 53 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 54 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 54 | 3 | Land abutting NH/SH/ZPP/MPP | ₹30,00,000 | 01-02-2025 |
| 54 | 4 | Land abutting NH/SH/ZPP/MPP | ₹30,00,000 | 01-02-2025 |
| 55 | Land abutting NH/SH/ZPP/MPP | ₹30,00,000 | 01-02-2025 | |
| 56 | 1 | House Sites | ₹87,12,000 | 01-02-2025 |
| 56 | 1B | House Sites | ₹87,12,000 | 01-02-2025 |
| 56 | 2 | House Sites | ₹87,12,000 | 01-02-2025 |
| 56 | 3 | House Sites | ₹87,12,000 | 01-02-2025 |
| 56 | 4 | House Sites | ₹87,12,000 | 01-02-2025 |
| 56 | 4B | House Sites | ₹87,12,000 | 01-02-2025 |
| 56 | 5 | Land abutting NH/SH/ZPP/MPP | ₹30,00,000 | 01-02-2025 |
| 58 | Dry land | ₹20,00,000 | 01-02-2025 | |
| 64 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 64 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 64 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 64 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 64 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 64 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 64 | 7 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 64 | 8 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 64 | 9 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 64 | 10 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 64 | 11 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 65 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 | |
| 70 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 70 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 70 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 73 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 73 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 73 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 73 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 74 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 74 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 74 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 74 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 74 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 75 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 75 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 75 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 77 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 77 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 77 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 82 | 1 | House Sites | ₹87,12,000 | 01-02-2025 |
| 82 | 2 | House Sites | ₹87,12,000 | 01-02-2025 |
| 82 | 3 | House Sites | ₹87,12,000 | 01-02-2025 |
| 82 | 4A | House Sites | ₹87,12,000 | 01-02-2025 |
| 82 | 4B | House Sites | ₹87,12,000 | 01-02-2025 |
| 82 | 4C | House Sites | ₹87,12,000 | 01-02-2025 |
| 82 | 5 | House Sites | ₹87,12,000 | 01-02-2025 |
| 82 | 6 | House Sites | ₹87,12,000 | 01-02-2025 |
| 83 | 1 | House Sites | ₹87,12,000 | 01-02-2025 |
| 83 | 2 | House Sites | ₹87,12,000 | 01-02-2025 |
| 83 | 3 | House Sites | ₹87,12,000 | 01-02-2025 |
| 83 | 4 | House Sites | ₹87,12,000 | 01-02-2025 |
| 83 | 5 | House Sites | ₹87,12,000 | 01-02-2025 |
| 83 | 6 | House Sites | ₹87,12,000 | 01-02-2025 |
| 83 | 7 | House Sites | ₹87,12,000 | 01-02-2025 |
| 83 | 8 | House Sites | ₹87,12,000 | 01-02-2025 |
| 83 | 9 | House Sites | ₹87,12,000 | 01-02-2025 |
| 83 | 10 | House Sites | ₹87,12,000 | 01-02-2025 |
| 83 | 11 | House Sites | ₹87,12,000 | 01-02-2025 |
| 85 | 1 | House Sites | ₹87,12,000 | 01-02-2025 |
| 85 | 2 | House Sites | ₹87,12,000 | 01-02-2025 |
| 85 | 3 | House Sites | ₹87,12,000 | 01-02-2025 |
| 85 | 4 | House Sites | ₹87,12,000 | 01-02-2025 |
| 85 | 10A | House Sites | ₹87,12,000 | 01-02-2025 |
| 86 | 1 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 86 | 2 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 86 | 3 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 86 | 4 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 86 | 5 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 86 | 6 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 86 | 7 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 86 | 8 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 86 | 9 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 86 | 10 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 86 | 11 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 86 | 12 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 86 | 13 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 86 | 14 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 86 | 15 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 86 | 16 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 86 | 17 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 1A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 1B | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 1C | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 2A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 2B | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 2C | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 2D | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 2E | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 3A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 3B | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 3C | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 3D | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 3E | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 3F | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 4A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 4B | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 5A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 5B | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 6A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 87 | 6B | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 88 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 88 | 1A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 88 | 1B | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 88 | 1C | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 88 | 1D | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 88 | 1E | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 88 | 1F | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 88 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 89 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 89 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 89 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 89 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 89 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 91 | 1B | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 91 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 91 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 91 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 91 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 91 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 91 | 7 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 91 | 8 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 92 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 92 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 92 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 92 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 92 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 92 | 6 | Dry land | ₹13,00,000 | 01-02-2025 |
| 92 | 7 | Dry land | ₹13,00,000 | 01-02-2025 |
| 92 | 8 | Dry land | ₹13,00,000 | 01-02-2025 |
| 92 | 9 | Dry land | ₹13,00,000 | 01-02-2025 |
| 93 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 93 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 93 | 3A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 93 | 3B | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 93 | 3C | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 94 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 94 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 96 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 96 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 98 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 98 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 98 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 99 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 99 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 100 | House Sites | ₹87,12,000 | 01-02-2025 | |
| 102 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 102 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 102 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 102 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 102 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 102 | 6 | Dry land | ₹13,00,000 | 01-02-2025 |
| 102 | 7 | Dry land | ₹13,00,000 | 01-02-2025 |
| 103 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 106 | 1A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 106 | 2A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 106 | 3A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 106 | 4A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 106 | 5A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 107 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 107 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 107 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 107 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 107 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 108 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 108 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 108 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 108 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 108 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 111 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 111 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 111 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 111 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 111 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 112 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 112 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 112 | 3A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 112 | 3B | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 113 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 113 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 113 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 113 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 113 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 113 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 114 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 114 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 114 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 114 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 114 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 114 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 114 | 7A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 114 | 8 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 114 | 9 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 114 | 10 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 114 | 11 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 119 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 119 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 119 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 120 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 120 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 120 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 121 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 121 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 121 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 121 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 121 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 121 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 122 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 122 | 2A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 124 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 124 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 124 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 125 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 125 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 125 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 125 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 125 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 126 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 126 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 126 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 126 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 126 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 126 | 6 | Dry land | ₹13,00,000 | 01-02-2025 |
| 127 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 127 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 127 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 127 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 127 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 127 | 6 | Dry land | ₹13,00,000 | 01-02-2025 |
| 127 | 7 | Dry land | ₹13,00,000 | 01-02-2025 |
| 127 | 8 | Dry land | ₹13,00,000 | 01-02-2025 |
| 127 | 9 | Dry land | ₹13,00,000 | 01-02-2025 |
| 127 | 10 | Dry land | ₹13,00,000 | 01-02-2025 |
| 127 | 11 | Dry land | ₹13,00,000 | 01-02-2025 |
| 140 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 140 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 140 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 140 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 141 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 141 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 141 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 142 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 142 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 142 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 142 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 142 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 142 | 6 | Dry land | ₹13,00,000 | 01-02-2025 |
| 142 | 7 | Dry land | ₹13,00,000 | 01-02-2025 |
| 143 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 143 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 143 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 143 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 143 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 143 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 143 | 7 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 143 | 8 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 143 | 9 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 143 | 10 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 143 | 11 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 143 | 12 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 146 | 1 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 2 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 3 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 4 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 5 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 6 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 7 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 8 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 9 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 11 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 12 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 13 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 14 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 15 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 16 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 17 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 18 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 19 | House Sites | ₹87,12,000 | 01-02-2025 |
| 146 | 20 | House Sites | ₹87,12,000 | 01-02-2025 |
| 149 | House Sites | ₹87,12,000 | 01-02-2025 | |
| 150 | 1 | House Sites | ₹87,12,000 | 01-02-2025 |
| 150 | 2 | House Sites | ₹87,12,000 | 01-02-2025 |
| 150 | 3 | House Sites | ₹87,12,000 | 01-02-2025 |
| 150 | 4 | House Sites | ₹87,12,000 | 01-02-2025 |
| 150 | 5 | House Sites | ₹87,12,000 | 01-02-2025 |
| 150 | 6 | House Sites | ₹87,12,000 | 01-02-2025 |
| 152 | House Sites | ₹87,12,000 | 01-02-2025 | |
| 153 | House Sites | ₹87,12,000 | 01-02-2025 | |
| 154 | House Sites | ₹87,12,000 | 01-02-2025 | |
| 156 | House Sites | ₹87,12,000 | 01-02-2025 | |
| 157 | 1 | House Sites | ₹87,12,000 | 01-02-2025 |
| 157 | 2 | House Sites | ₹87,12,000 | 01-02-2025 |
| 157 | 3 | House Sites | ₹87,12,000 | 01-02-2025 |
| 157 | 4 | House Sites | ₹87,12,000 | 01-02-2025 |
| 157 | 5 | House Sites | ₹87,12,000 | 01-02-2025 |
| 157 | 6 | House Sites | ₹87,12,000 | 01-02-2025 |
| 157 | 7 | House Sites | ₹87,12,000 | 01-02-2025 |
| 157 | 8 | House Sites | ₹87,12,000 | 01-02-2025 |
| 157 | 9 | House Sites | ₹87,12,000 | 01-02-2025 |
| 157 | 10 | House Sites | ₹87,12,000 | 01-02-2025 |
| 157 | 11 | House Sites | ₹87,12,000 | 01-02-2025 |
| 157 | 12 | House Sites | ₹87,12,000 | 01-02-2025 |
| 157 | 13 | House Sites | ₹87,12,000 | 01-02-2025 |
| 157 | 14 | House Sites | ₹87,12,000 | 01-02-2025 |
| 157 | 15 | House Sites | ₹87,12,000 | 01-02-2025 |
| 157 | 16 | House Sites | ₹87,12,000 | 01-02-2025 |
| 158 | 1 | House Sites | ₹87,12,000 | 01-02-2025 |
| 158 | 2 | House Sites | ₹87,12,000 | 01-02-2025 |
| 158 | 3 | House Sites | ₹87,12,000 | 01-02-2025 |
| 158 | 4 | House Sites | ₹87,12,000 | 01-02-2025 |
| 158 | 5 | House Sites | ₹87,12,000 | 01-02-2025 |
| 158 | 6 | House Sites | ₹87,12,000 | 01-02-2025 |
| 158 | 7 | House Sites | ₹87,12,000 | 01-02-2025 |
| 158 | 8 | House Sites | ₹87,12,000 | 01-02-2025 |
| 158 | 9 | House Sites | ₹87,12,000 | 01-02-2025 |
| 158 | 10 | House Sites | ₹87,12,000 | 01-02-2025 |
| 158 | 11 | House Sites | ₹87,12,000 | 01-02-2025 |
| 159 | 2 | House Sites | ₹87,12,000 | 01-02-2025 |
| 159 | 3 | House Sites | ₹87,12,000 | 01-02-2025 |
| 159 | 4 | House Sites | ₹87,12,000 | 01-02-2025 |
| 159 | 5 | House Sites | ₹87,12,000 | 01-02-2025 |
| 159 | 6 | House Sites | ₹87,12,000 | 01-02-2025 |
| 159 | 7 | House Sites | ₹87,12,000 | 01-02-2025 |
| 159 | 8 | House Sites | ₹87,12,000 | 01-02-2025 |
| 160 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 160 | 3A | House Sites | ₹87,12,000 | 01-02-2025 |
| 160 | 4 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 163 | 1 | House Sites | ₹87,12,000 | 01-02-2025 |
| 163 | 2 | House Sites | ₹87,12,000 | 01-02-2025 |
| 163 | 3 | House Sites | ₹87,12,000 | 01-02-2025 |
| 163 | 4 | House Sites | ₹87,12,000 | 01-02-2025 |
| 163 | 5 | House Sites | ₹87,12,000 | 01-02-2025 |
| 163 | 6 | House Sites | ₹87,12,000 | 01-02-2025 |
| 163 | 7 | House Sites | ₹87,12,000 | 01-02-2025 |
| 163 | 8 | House Sites | ₹87,12,000 | 01-02-2025 |
| 163 | 9 | House Sites | ₹87,12,000 | 01-02-2025 |
| 163 | 10 | House Sites | ₹87,12,000 | 01-02-2025 |
| 163 | 11 | House Sites | ₹87,12,000 | 01-02-2025 |
| 163 | 12 | House Sites | ₹87,12,000 | 01-02-2025 |
| 163 | 13 | House Sites | ₹87,12,000 | 01-02-2025 |
| 164 | 1 | House Sites | ₹87,12,000 | 01-02-2025 |
| 165 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 165 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 165 | 3 | House Sites | ₹87,12,000 | 01-02-2025 |
| 165 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 165 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 165 | 6 | Dry land | ₹13,00,000 | 01-02-2025 |
| 165 | 7 | Dry land | ₹13,00,000 | 01-02-2025 |
| 165 | 8 | Dry land | ₹13,00,000 | 01-02-2025 |
| 165 | 9 | Dry land | ₹13,00,000 | 01-02-2025 |
| 165 | 10 | Dry land | ₹13,00,000 | 01-02-2025 |
| 165 | 11 | Dry land | ₹13,00,000 | 01-02-2025 |
| 165 | 12 | Dry land | ₹13,00,000 | 01-02-2025 |
| 165 | 13 | Dry land | ₹13,00,000 | 01-02-2025 |
| 165 | 14 | Dry land | ₹13,00,000 | 01-02-2025 |
| 166 | 1 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 2 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 3 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 4 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 5 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 6 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 7 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 8 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 9 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 10 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 11 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 12 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 13 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 14 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 15 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 16 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 17 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 18 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 19 | House Sites | ₹87,12,000 | 01-02-2025 |
| 166 | 20 | House Sites | ₹87,12,000 | 01-02-2025 |
| 167 | 1 | House Sites | ₹87,12,000 | 01-02-2025 |
| 167 | 2 | House Sites | ₹87,12,000 | 01-02-2025 |
| 167 | 3 | House Sites | ₹87,12,000 | 01-02-2025 |
| 167 | 4 | House Sites | ₹87,12,000 | 01-02-2025 |
| 167 | 5 | House Sites | ₹87,12,000 | 01-02-2025 |
| 167 | 6 | House Sites | ₹87,12,000 | 01-02-2025 |
| 167 | 7 | House Sites | ₹87,12,000 | 01-02-2025 |
| 167 | 8 | House Sites | ₹87,12,000 | 01-02-2025 |
| 169 | 1 | House Sites | ₹87,12,000 | 01-02-2025 |
| 169 | 2 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 169 | 3 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 169 | 4 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 169 | 5 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 169 | 6 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 169 | 7 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 169 | 8 | Agricultural Land fit for H.S. | ₹27,50,000 | 01-02-2025 |
| 169 | 9A | House Sites | ₹87,12,000 | 01-02-2025 |
| 169 | 9B | House Sites | ₹87,12,000 | 01-02-2025 |
| 169 | 10 | House Sites | ₹87,12,000 | 01-02-2025 |
| 169 | 11 | House Sites | ₹87,12,000 | 01-02-2025 |
| 169 | 12 | House Sites | ₹87,12,000 | 01-02-2025 |
| 169 | 13 | House Sites | ₹87,12,000 | 01-02-2025 |
| 169 | 14 | House Sites | ₹87,12,000 | 01-02-2025 |
| 169 | 15 | House Sites | ₹87,12,000 | 01-02-2025 |
| 169 | 16 | House Sites | ₹87,12,000 | 01-02-2025 |
| 170 | 1 | House Sites | ₹87,12,000 | 01-02-2025 |
| 170 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 173 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 173 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 173 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 173 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 173 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 173 | 6 | Dry land | ₹13,00,000 | 01-02-2025 |
| 173 | 7 | Dry land | ₹13,00,000 | 01-02-2025 |
| 173 | 8 | Dry land | ₹13,00,000 | 01-02-2025 |
| 173 | 9 | Dry land | ₹13,00,000 | 01-02-2025 |
| 173 | 10 | Dry land | ₹13,00,000 | 01-02-2025 |
| 174 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 174 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 174 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 174 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 174 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 174 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 174 | 7 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 174 | 8 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 174 | 9 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 174 | 10 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 174 | 11 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 174 | 12 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 174 | 13 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 174 | 14 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 174 | 15 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 180 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 180 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 180 | 3A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 180 | 4A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 180 | 5A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 181 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 181 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 181 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 181 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 181 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 186 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 186 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 186 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 186 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 188 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 188 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 188 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 188 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 188 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 189 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 189 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 189 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 189 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 189 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 189 | 6 | Dry land | ₹13,00,000 | 01-02-2025 |
| 189 | 7 | Dry land | ₹13,00,000 | 01-02-2025 |
| 191 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 196 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 196 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 196 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 196 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 196 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 196 | 6 | Dry land | ₹13,00,000 | 01-02-2025 |
| 196 | 7 | Dry land | ₹13,00,000 | 01-02-2025 |
| 196 | 8 | Dry land | ₹13,00,000 | 01-02-2025 |
| 196 | 9 | Dry land | ₹13,00,000 | 01-02-2025 |
| 197 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 200 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 200 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 200 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 200 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 201 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 | |
| 202 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 202 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 7 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 8 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 9 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 10 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 11 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 12 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 13 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 14 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 15 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 16 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 17 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 18 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 19 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 20 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 21 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 22 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 23 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 24 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 25 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 26 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 27 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 28 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 29 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 30 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 31 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 32 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 33 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 34 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 35 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 36 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 37 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 38 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 39 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 40 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 203 | 41 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 208 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 208 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 208 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 208 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 209 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 | |
| 210 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 | |
| 211 | Dry land | ₹13,00,000 | 01-02-2025 | |
| 213 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 213 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 213 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 213 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 213 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 213 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 215 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 215 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 215 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 218 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 218 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 219 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 219 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 219 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 219 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 220 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 220 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 220 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 220 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 220 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 220 | 6 | Dry land | ₹13,00,000 | 01-02-2025 |
| 221 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 221 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 222 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 222 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 224 | Dry land | ₹13,00,000 | 01-02-2025 | |
| 225 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 225 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 225 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 233 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 233 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 233 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 233 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 233 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 233 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 234 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 234 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 234 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 236 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 | |
| 239 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 239 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 239 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 239 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 239 | 5 | Dry land | ₹13,00,000 | 01-02-2025 |
| 239 | 6 | Dry land | ₹13,00,000 | 01-02-2025 |
| 240 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 240 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 240 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 241 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 243 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 243 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 243 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 243 | 4 | Dry land | ₹13,00,000 | 01-02-2025 |
| 244 | 1 | Dry land | ₹13,00,000 | 01-02-2025 |
| 244 | 2 | Dry land | ₹13,00,000 | 01-02-2025 |
| 244 | 3 | Dry land | ₹13,00,000 | 01-02-2025 |
| 245 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 | |
| 247 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 247 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 247 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 248 | 1A | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 248 | 1B | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 248 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 249 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 249 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 249 | 3 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 249 | 4 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 250 | Wet Land double crop | ₹13,00,000 | 01-02-2025 | |
| 251 | Wet Land double crop | ₹13,00,000 | 01-02-2025 | |
| 261 | Wet Land double crop | ₹13,00,000 | 01-02-2025 | |
| 262 | Wet Land double crop | ₹13,00,000 | 01-02-2025 | |
| 263 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 263 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 263 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 263 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 263 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 263 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 264 | 1A | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 264 | 1B | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 264 | 2A | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 264 | 2B | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 265 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 265 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 266 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 266 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 267 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 267 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 268 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 268 | 2A | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 268 | 2B | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 269 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 269 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 269 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 269 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 269 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 269 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 272 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 272 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 273 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 273 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 273 | 3 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 273 | 4 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 273 | 5 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 273 | 6 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 273 | 7 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 273 | 8 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 274 | Wet Land double crop | ₹13,00,000 | 01-02-2025 | |
| 275 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 275 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 276 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 276 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 276 | 3 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 276 | 4 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 276 | 5 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 276 | 6 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 278 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 278 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 278 | 3 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 279 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 279 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 279 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 279 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 279 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 279 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 287 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 287 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 287 | 3 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 287 | 4 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 287 | 5 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 287 | 6 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 287 | 7 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 288 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 288 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 288 | 3 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 289 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 289 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 289 | 3 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 289 | 4 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 289 | 5 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 289 | 6 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 289 | 7 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 289 | 8 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 289 | 9 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 289 | 10 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 290 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 290 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 290 | 3 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 290 | 4 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 290 | 5 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 290 | 6 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 290 | 7 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 291 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 291 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 291 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 291 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 291 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 292 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 292 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 292 | 3 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 292 | 4 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 292 | 5 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 292 | 6 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 292 | 7 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 292 | 8 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 293 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 293 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 293 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 293 | 4A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 293 | 4B | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 293 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 293 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 293 | 7 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 293 | 8 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 293 | 9 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 293 | 10 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 293 | 11 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 293 | 12 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 294 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 294 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 297 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 297 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 297 | 3 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 297 | 4 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 297 | 5 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 297 | 6 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 297 | 7 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 298 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 298 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 298 | 3 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 299 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 299 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 299 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 299 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 299 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 300 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 | |
| 301 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 301 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 301 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 301 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 301 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 301 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 301 | 7 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 301 | 8 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 301 | 9 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 302 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 302 | 2A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 302 | 2B | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 302 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 302 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 302 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 302 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 302 | 7 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 303 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 303 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 303 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 303 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 303 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 303 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 303 | 7 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 310 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 | |
| 311 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 311 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 311 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 311 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 311 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 311 | 6 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 311 | 7 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 311 | 8A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 311 | 8B | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 312 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 312 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 312 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 312 | 4A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 312 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 313 | 1A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 313 | 2A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 318 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 318 | 2A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 318 | 3A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 318 | 4A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 318 | 5A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 319 | 1 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 319 | 2 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 319 | 3 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 319 | 4 | Wet Land double crop | ₹13,00,000 | 01-02-2025 |
| 319 | Dry land | ₹13,00,000 | 01-02-2025 | |
| 320 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 320 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 320 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 321 | Wet Land double crop | ₹13,00,000 | 01-02-2025 | |
| 322 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 322 | 2 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 322 | 3 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 322 | 4 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 322 | 5 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 323 | Wet Land double crop | ₹13,00,000 | 01-02-2025 | |
| 324 | 1A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 324 | 2A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 324 | 3A | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| 325 | 1 | Land abutting NH/SH/ZPP/MPP | ₹22,00,000 | 01-02-2025 |
| Village | Residential ₹/sq yd | vs Vellalur | Farm land / acre |
|---|---|---|---|
| Ponnuru (town) (u) | ₹11,000 | +511.1% | ₹30.00 L |
| Nidubrole (u) | ₹9,000 | +400.0% | ₹28.00 L |
| Chintalapudi · చింతలపూడి | ₹3,600 | +100.0% | ₹25.00 L |
| Dandamudi · దండమూడి | ₹3,600 | +100.0% | ₹28.00 L |
| Patchala Tadiparru · పచ్చలతాడిపర్రు | ₹3,600 | +100.0% | ₹17.00 L |
| Mulukuduru · ములుకుదురు | ₹3,000 | +66.7% | ₹17.00 L |
| Mamillapalli · మామిళ్ళపల్లి | ₹2,600 | +44.4% | ₹15.00 L |
| Munipalle · మునిపల్లె | ₹2,300 | +27.8% | ₹15.00 L |
| Brahmana Kodur · బ్రాహ్మణ కోడూరు | ₹2,100 | +16.7% | ₹11.00 L |
| Aremanda · ఆరెమండ | ₹2,000 | +11.1% | ₹14.00 L |
| Doppalapudi · దొప్పలపూడి | ₹2,000 | +11.1% | ₹14.00 L |
| Kondamudi · కొండముది | ₹2,000 | +11.1% | ₹14.00 L |
| Mannava · మన్నవ | ₹2,000 | +11.1% | ₹14.00 L |
| Nandur · నండూరు | ₹2,000 | +11.1% | ₹12.00 L |
| Upparapalem · ఉప్పరపాలెం | ₹2,000 | +11.1% | ₹14.00 L |
| Vaddemukkala · వడ్డెముక్కల | ₹2,000 | +11.1% | ₹14.00 L |
| Vallabharao Palem · వల్లభరావుపాలెం | ₹2,000 | +11.1% | ₹12.00 L |
| Jadavalli · జడవల్లి | ₹1,800 | +0.0% | ₹12.00 L |
| Jupudi · జూపూడి | ₹1,300 | -27.8% | ₹9.00 L |
This is not an official government document. LandRate.in (భూమి ధర) is an independent website. The rates in this report are copied from the public market value pages of the Registration & Stamps Department, Govt of Andhra Pradesh (IGRS AP) as on 03-10-2026.
Government market values are the minimum values used for stamp duty and registration; actual sale prices are usually higher. Rates can be revised at any time. Verify on https://registration.ap.gov.in/igrs/newPropertyvalue or at the Sub-Registrar's Office before any transaction.
Cost estimates are indicative and exclude user charges, e-stamp fees and special concessions.