కొర్రపాడులో ఇంటి స్థలం ప్రభుత్వ విలువ గజానికి ₹1,200, వ్యవసాయ భూమి ఎకరాకు ₹12.00 L.
In Korrapadu, the government value of a house plot is ₹1,200 per sq yard and farm land is ₹12.00 L per acre. These are minimum values for registration, not sale prices.
| Property | Govt value | Stamp duty 5.0% | Transfer 1.5% | Reg. fee 1.0% | Total 7.5% |
|---|---|---|---|---|---|
| 100 గజాల స్థలం · 100 sq yd plot | ₹1,20,000 | ₹6,000 | ₹1,800 | ₹1,200 | ₹9,000 |
| 200 గజాల స్థలం · 200 sq yd plot | ₹2,40,000 | ₹12,000 | ₹3,600 | ₹2,400 | ₹18,000 |
| 300 గజాల స్థలం · 300 sq yd plot | ₹3,60,000 | ₹18,000 | ₹5,400 | ₹3,600 | ₹27,000 |
| 1 ఎకరం వ్యవసాయ భూమి · 1 acre farm land | ₹12,00,000 | ₹60,000 | ₹18,000 | ₹12,000 | ₹90,000 |
| Locality / ward | Type | Land ₹/sq yd | Previous | Ground ₹/sq ft | First | Other | Effective |
|---|---|---|---|---|---|---|---|
| VILLAGE SITE | Residential | ₹1,200 | ₹1,000 | ₹1,400 | ₹1,400 | ₹1,400 | 01-02-2025 |
| Land class | Rate per acre | Previous | Effective |
|---|---|---|---|
| Agricultural Land fit for H.S. | ₹14,52,000 | ₹14,52,000 | 01-02-2025 |
| Coconut Garden | ₹12,00,000 | ₹9,50,000 | 01-02-2025 |
| Dry land | ₹12,00,000 | ₹9,50,000 | 01-02-2025 |
| House Sites | ₹58,08,000 | ₹48,40,000 | 01-02-2025 |
| Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | ₹11,50,000 | 01-02-2025 |
| Wet Land double crop | ₹12,00,000 | ₹9,50,000 | 01-02-2025 |
| Survey no. | Sub-division | Land class | Rate per acre | Effective |
|---|---|---|---|---|
| 9 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 10 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 12 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 13 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 14 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 15 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 16 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 17 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 19 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 20 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 21 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 22 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 23 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 24 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 25 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 26 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 27 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 28 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 29 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 30 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 31 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 33 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 34 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 35 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 36 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 37 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 38 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 39 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 40 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 41 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 43 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 44 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 46 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 47 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 48 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 49 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 50 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 51 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 52 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 53 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 54 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 55 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 56 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 57 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 59 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 60 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 61 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 62 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 63 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 64 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 65 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 66 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 67 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 68 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 69 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 71 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 72 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 73 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 74 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 75 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 76 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 77 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 78 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 80 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 81 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 82 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 83 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 84 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 86 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 87 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 88 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 89 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 90 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 91 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 92 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 93 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 94 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 95 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 96 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 97 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 98 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 99 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 100 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 101 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 111 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 113 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 114 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 115 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 116 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 117 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 119 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 120 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 121 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 122 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 123 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 124 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 125 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 126 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 127 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 128 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 129 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 130 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 131 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 133 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 134 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 135 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 136 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 158 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 174 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 175 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 176 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 177 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 178 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 179 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 180 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 181 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 182 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 183 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 184 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 197 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 198 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 200 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 201 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 202 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 203 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 204 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 205 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 206 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 207 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 208 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 209 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 210 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 211 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 212 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 214 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 215 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 216 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 218 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 219 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 220 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 221 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 222 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 223 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 224 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 225 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 226 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 227 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 228 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 229 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 230 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 232 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 233 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 234 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 235 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 236 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 237 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 238 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 239 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 240 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 241 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 248 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 249 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 250 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 252 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 253 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 254 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 255 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 256 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 257 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 258 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 259 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 260 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 261 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 262 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 264 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 265 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 266 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 269 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 270 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 271 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 272 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 273 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 297 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 298 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 312 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 313 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 314 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 315 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 316 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 317 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 318 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 319 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 320 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 321 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 322 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 323 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 324 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 325 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 326 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 327 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 328 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 329 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 330 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 331 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 332 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 333 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 334 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 335 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 336 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 337 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 338 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 339 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 341 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 342 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 343 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 344 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 352 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 353 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 354 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 355 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 356 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 357 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 358 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 359 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 360 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 361 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 363 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 364 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 365 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 366 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 367 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 372 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 373 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 374 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 376 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 377 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 378 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 379 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 380 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 381 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 382 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 383 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 384 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 386 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 387 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 388 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 390 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 391 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 392 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 393 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 394 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 396 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 397 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 398 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 399 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 400 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 401 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 402 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 404 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 405 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 406 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 407 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 408 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 409 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 411 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 412 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 413 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 414 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 415 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 416 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 417 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 419 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 420 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 421 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 422 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 423 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 424 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 425 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 426 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 427 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 428 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 429 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 430 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 431 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 432 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 433 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 437 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 473 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 474 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 475 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 477 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 478 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 480 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 481 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 482 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 483 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 484 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 485 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 486 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 487 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 488 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 522 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 523 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 524 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 525 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 526 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 527 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 528 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 529 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 530 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 531 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 532 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 533 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 534 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 535 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 536 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 537 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 538 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 539 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 540 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 541 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 554 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 556 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 577 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 578 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 579 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 585 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 617 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 618 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 620 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 621 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 622 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 623 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 624 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 625 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 626 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 627 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 628 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 629 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 630 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 631 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 633 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 634 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 635 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 636 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 640 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 641 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 642 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 643 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 644 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 653 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 654 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 655 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 656 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 666 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 667 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 668 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 669 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 670 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 671 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 672 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 673 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 674 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 675 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 676 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 681 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 987 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 990 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 993 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 999 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1000 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1001 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1002 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1004 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1005 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1006 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1017 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1018 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1019 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1020 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1021 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1023 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1024 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1105 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1116 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1147 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1167 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1203 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1212 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1213 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1220 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1225 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 1230 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 1311 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1337 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1399 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1421 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1437 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1447 | Dry land | ₹13,00,000 | 01-02-2025 | |
| 1448 | Dry land | ₹13,00,000 | 01-02-2025 | |
| 1450 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 1451 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 1463 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1465 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1466 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1467 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1471 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1480 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1481 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1482 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 1561 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1603 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1636 | Agricultural Land fit for H.S. | ₹14,52,000 | 01-02-2025 | |
| 1637 | Agricultural Land fit for H.S. | ₹14,52,000 | 01-02-2025 | |
| 1638 | Agricultural Land fit for H.S. | ₹14,52,000 | 01-02-2025 | |
| 1639 | Agricultural Land fit for H.S. | ₹14,52,000 | 01-02-2025 | |
| 1640 | Agricultural Land fit for H.S. | ₹14,52,000 | 01-02-2025 | |
| 1641 | Agricultural Land fit for H.S. | ₹14,52,000 | 01-02-2025 | |
| 1642 | Agricultural Land fit for H.S. | ₹14,52,000 | 01-02-2025 | |
| 1643 | Agricultural Land fit for H.S. | ₹14,52,000 | 01-02-2025 | |
| 1644 | Agricultural Land fit for H.S. | ₹14,52,000 | 01-02-2025 | |
| 1645 | Agricultural Land fit for H.S. | ₹14,52,000 | 01-02-2025 | |
| 1646 | Agricultural Land fit for H.S. | ₹14,52,000 | 01-02-2025 | |
| 1651 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1652 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1653 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1654 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1655 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1656 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1657 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1658 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1659 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1660 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1661 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1662 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1663 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1664 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1665 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1666 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1667 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1668 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1669 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1670 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1671 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1672 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1674 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1675 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1676 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1677 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1678 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1679 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1685 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1688 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1691 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1693 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1696 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1697 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1730 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1731 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1732 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1733 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1735 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1736 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1737 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 1738 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1739 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1740 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1741 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1742 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1743 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1744 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1745 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1746 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1747 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1748 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1749 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1750 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1751 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1752 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1753 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1754 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1756 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1757 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1758 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1759 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1760 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1761 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1762 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1763 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1764 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1765 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1766 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1767 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1768 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1769 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1770 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1771 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1772 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1773 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1774 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1775 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1776 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1777 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1778 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1779 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1780 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1781 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1782 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1783 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1784 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1785 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1811 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1813 | Agricultural Land fit for H.S. | ₹14,52,000 | 01-02-2025 | |
| 1814 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1817 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 1818 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 1819 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 1820 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 1821 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 1822 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 1823 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1824 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1825 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1826 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1827 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1832 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1834 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 1841 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1848 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 1851 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 1853 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1859 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 1883 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1910 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1954 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1956 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 1962 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 1963 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 1964 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 1969 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 1993 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1994 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 1995 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1996 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 1999 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2000 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2002 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 2004 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2005 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2006 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2007 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2008 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2011 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2012 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2013 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2015 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2016 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2018 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2019 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2020 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2036 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2038 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2040 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2042 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2043 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2045 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2047 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2048 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2049 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2050 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2051 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2052 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2053 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2054 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2055 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2056 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2057 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2058 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2059 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2064 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2065 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2066 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2067 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2068 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2069 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2070 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2071 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2072 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2073 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2074 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2075 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2076 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2077 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2078 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2079 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2088 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 2089 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 2090 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 2091 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 2093 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 2094 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2097 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2098 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2099 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2100 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2101 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2103 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2104 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2106 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 2107 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2109 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2110 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2111 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2112 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2113 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2114 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2115 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2116 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2118 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2119 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2120 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2121 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2122 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2132 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 2151 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2203 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2226 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2266 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2276 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2277 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2278 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2279 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2280 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2281 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2282 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2288 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2289 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2290 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2294 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2296 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2334 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2336 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2337 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2340 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2342 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2361 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2363 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2364 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2365 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2366 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2367 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2368 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2369 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2370 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2371 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2372 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2373 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2374 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2376 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2377 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2378 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2383 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2384 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2385 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2386 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2387 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2388 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2389 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2390 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2391 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2392 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2393 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2394 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2396 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2397 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2398 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2399 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2400 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2402 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2407 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2408 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2409 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2410 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2411 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2412 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2414 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2415 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2417 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2418 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2419 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2420 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2424 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2429 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2439 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2440 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2441 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2447 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2450 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2452 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2453 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2454 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2455 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2456 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2463 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2464 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2465 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2466 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2467 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2469 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2475 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2476 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2477 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2478 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2479 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2483 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2485 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2497 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2498 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2499 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2500 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2501 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2554 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2582 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 2605 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2606 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2607 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2608 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2609 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2610 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2611 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2612 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2617 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2618 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2619 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2620 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2621 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2622 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2623 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2624 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2625 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2626 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2627 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2628 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2629 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2630 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2637 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2642 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2646 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2647 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2648 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2649 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2650 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2651 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2652 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2654 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2655 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2657 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2658 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2659 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2661 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2662 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2673 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2674 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2676 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2677 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2678 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2680 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2681 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2682 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2683 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2684 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2685 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2687 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2688 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2689 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2690 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2691 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2692 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2693 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2694 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2695 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2696 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2697 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2698 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2699 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2700 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2701 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2703 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2704 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2705 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2706 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2707 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2708 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2709 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2710 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2711 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2712 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2713 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2714 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2715 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2716 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2717 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2718 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2719 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2720 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2721 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2722 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2723 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2724 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2725 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2726 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2727 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2728 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2729 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2730 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2731 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2732 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2733 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2734 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2735 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2736 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2737 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2738 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2739 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2740 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2741 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2742 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2743 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2744 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2745 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2747 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2749 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2750 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2751 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2752 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2753 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2754 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2755 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2756 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2757 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2758 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2759 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2760 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2761 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2762 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2763 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2764 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2765 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2766 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2767 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2769 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2770 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2771 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2772 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2773 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2774 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2775 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2776 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2777 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2778 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2779 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2780 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2781 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2782 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2783 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2789 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2797 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 2829 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2833 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2834 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2835 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2836 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2846 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2849 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2851 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2852 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2853 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2854 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2855 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2859 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2860 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2861 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2862 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2863 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2864 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2865 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2866 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2867 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2868 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2869 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2913 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2914 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2915 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2916 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2917 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2918 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2919 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2935 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 2946 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2947 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2948 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2949 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2950 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2951 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2952 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2953 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2954 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2955 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2956 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2957 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2958 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2959 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2960 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2961 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2962 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2963 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2964 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2965 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2966 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2968 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2969 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2971 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2972 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2973 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2974 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2975 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2976 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2977 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2979 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2980 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2981 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2982 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2983 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2984 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2985 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2986 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2987 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2988 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2989 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2992 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 2998 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 2999 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3000 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3002 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3003 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3004 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3005 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3006 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3007 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 3008 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3009 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3010 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3015 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3018 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3019 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3024 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3028 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3029 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3030 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3031 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3037 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3038 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3040 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3058 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3059 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3060 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3061 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3062 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3063 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3064 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3068 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3069 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3070 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3091 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3100 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 3106 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3107 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3108 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3109 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3110 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 3111 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3113 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3117 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3118 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3119 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3120 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 3121 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 3124 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3125 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3126 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3127 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3128 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3134 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3136 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3137 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3138 | Dry land | ₹15,00,000 | 01-02-2025 | |
| 3153 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3154 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 3158 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3159 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3161 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3162 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3163 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3164 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3165 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3167 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3168 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3169 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3170 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3171 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3172 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3175 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3177 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3179 | Dry land | ₹13,00,000 | 01-02-2025 | |
| 3180 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 3183 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3184 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 3185 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3186 | Agricultural Land fit for H.S. | ₹14,52,000 | 01-02-2025 | |
| 3188 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 3189 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3190 | Land abutting NH/SH/ZPP/MPP | ₹20,00,000 | 01-02-2025 | |
| 3194 | House Sites | ₹58,08,000 | 01-02-2025 | |
| 3195 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3196 | Land abutting NH/SH/ZPP/MPP | ₹25,00,000 | 01-02-2025 | |
| 3210 | Land abutting NH/SH/ZPP/MPP | ₹16,00,000 | 01-02-2025 | |
| 3211 | Dry land | ₹13,00,000 | 01-02-2025 |
| Village | Residential ₹/sq yd | vs Korrapadu | Farm land / acre |
|---|---|---|---|
| Medikonduru · మేడికొండూరు | ₹5,000 | +316.7% | ₹12.00 L |
| Pericherla · పేరేచర్ల | ₹5,000 | +316.7% | ₹27.00 L |
| Visadala · విసదల | ₹3,000 | +150.0% | ₹12.00 L |
| Dokiparru · డోకిపర్రు | ₹2,500 | +108.3% | ₹12.00 L |
| Mandapadu · మందపాడు | ₹2,500 | +108.3% | ₹12.00 L |
| Siripuram · సిరిపురం | ₹1,700 | +41.7% | ₹10.00 L |
| Potlapadu · పొట్లపాడు | ₹1,500 | +25.0% | ₹10.00 L |
| Velavarthi Padu · వెలవర్తిపాడు | ₹1,500 | +25.0% | ₹10.00 L |
| Paladugu · పాలడుగు | ₹1,000 | -16.7% | ₹10.00 L |
| Varagani · వరగాని | ₹1,000 | -16.7% | ₹10.00 L |
| Mangalagiripadu · మంగళగిరిపాడు | ₹800 | -33.3% | ₹6.50 L |
| Ponugupadu Kandrika | ₹700 | -41.7% | ₹7.00 L |
This is not an official government document. LandRate.in (భూమి ధర) is an independent website. The rates in this report are copied from the public market value pages of the Registration & Stamps Department, Govt of Andhra Pradesh (IGRS AP) as on 04-10-2026.
Government market values are the minimum values used for stamp duty and registration; actual sale prices are usually higher. Rates can be revised at any time. Verify on https://registration.ap.gov.in/igrs/newPropertyvalue or at the Sub-Registrar's Office before any transaction.
Cost estimates are indicative and exclude user charges, e-stamp fees and special concessions.